33 min listen
Crossrail 2 with Michèle Dix
ratings:
Length:
50 minutes
Released:
Aug 28, 2019
Format:
Podcast episode
Description
This month on The Engineers Collective, Mark and Alex are joined by the managing director of Crossrail 2, Michèle Dix. The trio, of course, talk Crossrail 2 and the impacts of lessons learned by Crossrail 1. Innovation, embracing new technologies and the future of large infrastructure projects are all under the microscope as Michèle offers a fascinating insight into her observations about the industry.
The interview with Michèle Dix begins at 12:02.
This episode also looks at the new HS2 review, talks dam safety in the wake of Whaley Bridge and asks: is Boris Johnson going to be our infrastructure champion?
The Engineers Collective is powered by Bentley Systems. MRT Corp was established to deliver the Klang Valley Mass Rapid Transit project, a planned three-line modern railway system in the Greater Kuala Lumpur-Klang Valley region of Malaysia. With the first line completed in July 2017, MRT Corp was the first metro project in Asia to adopt BIM Level 2 standards plus cloud-based collaboration to streamline workflows and improve efficiency, productivity, and performance on its second line, the Sungai Buloh-Serdang-Putrajaya (SSP) line. Establishing a connected data environment using Bentley applications as its foundation, MRT Corp has reduced rework, improved multi-discipline design collaboration, and increased productivity by 35 percent due to its ability to seamlessly share accurate information in real time. Find out how MRT Corp is Going Digital with Bentley and learn more about the project by visiting: www.bentley.com/sspline
The interview with Michèle Dix begins at 12:02.
This episode also looks at the new HS2 review, talks dam safety in the wake of Whaley Bridge and asks: is Boris Johnson going to be our infrastructure champion?
The Engineers Collective is powered by Bentley Systems. MRT Corp was established to deliver the Klang Valley Mass Rapid Transit project, a planned three-line modern railway system in the Greater Kuala Lumpur-Klang Valley region of Malaysia. With the first line completed in July 2017, MRT Corp was the first metro project in Asia to adopt BIM Level 2 standards plus cloud-based collaboration to streamline workflows and improve efficiency, productivity, and performance on its second line, the Sungai Buloh-Serdang-Putrajaya (SSP) line. Establishing a connected data environment using Bentley applications as its foundation, MRT Corp has reduced rework, improved multi-discipline design collaboration, and increased productivity by 35 percent due to its ability to seamlessly share accurate information in real time. Find out how MRT Corp is Going Digital with Bentley and learn more about the project by visiting: www.bentley.com/sspline
Released:
Aug 28, 2019
Format:
Podcast episode
Titles in the series (84)
Digital Twins with Bhupinder Singh: In this special episode of The Engineers Collective, Mark and Alex are joined by Bentley Systems’ Chief Product Officer, Bhupinder Singh. The trio talk Digital Twins. What are they? What can they be used for? What does the future look like for Digita... by The Engineers Collective