Rail Express

TIME TRAVELLER

50 YEARS AGO...

JUNE 1969

Accelerations in the Western Region summer timetable followed on from Paddington-Plymouth/ Penzance services no longer conveying portions for Torbay, which would instead have its own independent through-trains four times a day in each direction. The move allowed an hourly pattern of departures between Paddington and Exeter, with accelerations of up to 20 minutes between London and Plymouth and up to 65 minutes to Penzance. The down ‘Cornish Riviera Express’ was timetabled to cover the 225.75 miles from Paddington to Plymouth in 3hr 30min with one stop at Exeter,

You’re reading a preview, subscribe to read more.

More from Rail Express

Rail Express4 min read
Tata Receives Seventh Clayton
CLAYTON Equipment has completed the construction of the two additional CBD90 shunters ordered by Tata Steel last year, with the departure of the second hybrid machine from its Burtonupon-Trent workshops on March 13. This was delivered to Port Talbot
Rail Express9 min read
TPE’s Class 397s – Serving Scotland In Style
CONSTRUCCIONES y Auxiliar de Ferrocarriles (CAF) Class 397 electric multiple units (EMUs) are part of the Spanish manufacturer’s Civity family of units, with 12 owned by rolling stock leasing company Eversholt Rail Group and leased to TransPennine Ex
Rail Express2 min read
Intermodal Wagon In TT:120 Announced
IN APRIL, Hornby revealed its new TT:120 range for 2024 which includes a useful intermodal wagon which has been constructed in large numbers and sees regular use on Network Rail. The Sffgmss IFA is a single intermodal wagon with drawgear at each end.

Related