56 min listen
Episode 36. Upgrading workholding and streamlining paint
Episode 36. Upgrading workholding and streamlining paint
ratings:
Length:
35 minutes
Released:
Jun 21, 2023
Format:
Podcast episode
Description
In this episode Devin and Uriel talk about some of the improvments they made over the past week and the thinking behind each.
8 Lean wastes - Over production, Over Processing, Excess inventory, Defects, Transportation, Wasted motion, Waiting, Wasted human potential
Some of the improvements include:
- Adding paint racks and shelving
- Reprogrammed cams to eliminate defects
- Moved paint scale
- Lebeled webbing racks
- Added a second pneumatic vise to smooth workflow
- Upgraded machine valve mounting plate
- Bought four more Schunk KSC manual vises to standardize programming and workholding
- Moved toolsetter on R450
- Lichen Precision Started nogiating a lease on a new space
Please follow us on Instagram and share your improvements and tag us.www.instagram.com/incrementalci In this podcast we discuss concepts from Lean Manufacturing, the Toyota Production System, and general business management to improve our businesses. Thanks for listening! Please drop us a note with any and all feedback!
If you have parts you need machined, reach out to Devin@lichenprecision.com and follow on Instagram www.instagram.com/lichen_mfg If you need CNCed Buckles, check out www.austeremfg.com and follow at on Instagram www.instagram.com/austere_manufacturing
Released:
Jun 21, 2023
Format:
Podcast episode
Titles in the series (100)
Episode 21. What do you do when the bottleneck is you? by Incremental: The Continuous Improvement Podcast