Discover this podcast and so much more

Podcasts are free to enjoy without a subscription. We also offer ebooks, audiobooks, and so much more for just $11.99/month.

Ep 43 Harbor Cay Condo Construction Collapse

Ep 43 Harbor Cay Condo Construction Collapse

FromFAILUROLOGY


Ep 43 Harbor Cay Condo Construction Collapse

FromFAILUROLOGY

ratings:
Length:
33 minutes
Released:
Feb 13, 2022
Format:
Podcast episode

Description

Engineering News – Stretchable Thermometer (2:05)
This week's engineering failure is the Harbor Cay Condo Construction Collapse (6:10). Several issues (13:15) with the design and construction of the concrete slabs and columns led to the collapse of the building before it was even complete. There were consequences (29:25) for everyone involved and a lot of lessons to learn to prevent this from happening again. 
Check out our new Patreon page for Mini Failure bonus episodes - https://www.patreon.com/failurology
Photos/Sources/Summary from this episode - https://www.failurology.ca/
Ways to get in touch
Twitter - https://twitter.com/failurology
Email - thefailurologypodcast@gmail.com
Linked In - https://www.linkedin.com/company/failurology-podcast
YouTube - https://www.youtube.com/channel/UCh1Buq46PYyxKbCDGTqbsDg
Released:
Feb 13, 2022
Format:
Podcast episode

Titles in the series (99)

A case study on engineering failures