Projects that Flow: More Projects in Less Time
Projects that Flow: More Projects in Less Time
Projects that Flow: More Projects in Less Time
Ebook606 pages3 hours

Projects that Flow: More Projects in Less Time

Rating: 3 out of 5 stars

3/5

()

Read preview

About this ebook

Projects can go over budget, exceed deadlines, or deliver restricted features and quality. This can result in economic damage for companies and their clients.The difficulties arise at source. Established metrics and management methods slow projects down by creating conflicts in operations and decision-making.

A radically new approach is needed; one that features? simple, constraint-oriented management,? clear, robust priorities,? company-wide rather than locally focused optimization,? a focus on speed, on ProjectsFlow.

Discover how you can:? complete more projects with the same amount of resources,? reliably deliver all projects to specs,? significantly shorten project lead times.

LanguageEnglish
PublisherIbidem Press
Release dateApr 1, 2014
ISBN9783838267593
Projects that Flow: More Projects in Less Time

Related to Projects that Flow

Related ebooks

Business For You

View More

Related articles

Reviews for Projects that Flow

Rating: 3 out of 5 stars
3/5

1 rating0 reviews

What did you think?

Tap to rate

Review must be at least 10 words

    Book preview

    Projects that Flow - Uwe Techt

    9783838267593

    ibidem Press, Stuttgart

    Table of Contents

    Acknowledgements

    1 Introduction

    2 Management summary: More projects in less time

    2.1 Initial situation

    Variability

    Projects compete for resources

    Efficiency before effectiveness

    Parkinson’s Law

    Summary of the initial situation

    2.2 New approach for multi-project organizations

    Reducing workload

    Relay runner principle and explicit safety buffers

    Synchronized operational priorities

    2.3 Challenges in the change process

    Part 1Current Reality in Multi-project Organizations

    3 Unreliability and long delivery times

    3.1 Damages through unreliability in project management

    Coating plant

    IT business

    Plant engineering

    Tool manufacturing

    Conclusion

    3.2 The implications of long project lead times

    Example: Coating plant

    3.3 Losses on internal projects

    3.4 Are costs/specifications more valuable than time?

    3.5 Benefits and uses of improvement

    Example: Coating plant

    4 Variability, Murphy’s Law, and harmful management mechanisms

    Variability

    Murphy’s Law

    Effects of variability and Murphy’s Law

    Caution

    Harmful management mechanisms in the project business

    5 WIP and resource allocation

    5.1 The matrix (resources/projects)

    5.2 Scarce resources/efficient use

    Dilemma 1: Increasing or decreasing capacity

    Dilemma 2: Make idle capacities visible or not?

    Dilemma 3: Promise more than the department can deliver—or not?

    5.3 Fighting for resources

    5.4 The resource manager’s pressure to decide

    5.5 Bad multitasking

    5.6 Thinly spread resources

    5.7 Desynchronization

    5.8 Lack of focus and multitasking in management and support functions

    5.9 High WIP creates long project durations and high costs

    5.10 Immediate project launches

    5.11 WIP vicious circle

    5.12 Poor preparation and mistakes

    5.13 Ailing projects have priority

    6 Project planning and management

    6.1 Deadlines and milestones

    6.2 Safety buffers in the project plan

    Buffer size

    6.3 Parkinson’s Law

    6.4 Resource allocation according to plan

    6.5 Student syndrome

    6.6 Vicious circle of safety buffers

    6.7 Delays at points of integration

    6.8 Early deliveries? Late deliveries!

    7 Operation and decision conflicts

    Employee: Include and use up safety buffers?

    Project managers: Withdraw resources from other projects?

    Resource managers: Increase capacity?

    Resource managers: Show idle capacities?

    Resource managers: Promise more than the business can achieve?

    Resource managers: Allow or prevent BM/PBS?

    Project vs. resource managers: Launch projects despite insufficient preparation?

    Harmful effects

    8 Worksheets and templates

    8.1 The organization’s current situation

    8.1.1 Project types

    8.1.2 Your organization

    8.1.3 Your project environment

    8.1.4 Typical project size and duration

    8.2 Project reliability

    8.3 Implications: Damage to your business

    8.3.1 Damages from unreliability

    8.3.2 Damages from very long project lead times

    8.4 Potential benefits

    8.4.1 Benefits from absolute reliability

    8.4.2 Benefits from significantly shorter project lead times

    8.5 Need for action and obstacles

    8.6 Management mechanisms

    8.6.1 Single-/multitasking

    8.6.2 Resource distribution

    8.6.3 Resource planning

    Names or skills

    Specialists

    Resource load according to project plan

    8.6.4 Determining project budgets

    8.6.5 Resource utilization

    8.6.6 Additional resource demand

    8.6.7 Synchronization

    8.6.8 Management and support

    Management

    Specialists

    Resources involved in earlier project phases

    8.6.9 Launching projects or project phases

    Project launch

    Preparation

    Project paths

    8.6.10 Reliability during project implementation

    8.6.11 Acceleration

    8.6.12 Safety buffers in the project plan

    8.6.13 Priorities

    Strategic priorities

    Operative priorities

    Changing operative priorities

    8.7 Operation and decision conflicts

    8.7.1 Overview of dilemmas

    Employee: Include and use up safety buffers?

    Project managers: Withdraw resources from other projects?

    Resource managers: Increase capacity?

    Resource managers: Show idle capacities?

    Resource managers: Promise more than the business can achieve?

    Resource managers: Allow or prevent BM/PBS?

    Project vs. resource managers: Launch projects despite insufficient preparation?

    Dilemma:

    Dilemma:

    Dilemma:

    8.7.2 Implications of operation and decision conflicts

    8.8 Cause and effect

    8.8.1 High WIP leads to long project durations and high costs

    8.8.2 WIP vicious circle

    8.8.3 Poor preparation and mistakes

    8.8.4 Ailing projects have priority

    8.8.5 Safety buffers in the project plan

    8.8.6 Parkinson’s Law

    8.8.7 Resource allocation according to plan

    8.8.8 Vicious circle of safety buffers

    8.8.9 Early deliveries? Late deliveries!

    8.9 Conclusion

    9 Summary and outlook

    9.1 Variability

    9.2 Projects compete for resources, vicious circle of WIP

    9.3 Efficiency before effectiveness

    9.4 Parkinson’s Law

    9.5 Conclusion

    9.6 Requirements for effective project and multi-project management

    Part 2The Future in Multi-project Management

    10 Core problem: Local optimization

    Evidence that the paradigm of local optimization is invalid

    Throughput

    Costs

    In summary

    11 Solution: Top priority!?

    12 Managing WIP

    12.1 Staggering projects at the constraint

    Identifying the constraint

    Optimally using the constraint

    Subordinating everything else to the decision (of optimally utilizing the constraint)

    12.2 Management as a constraint

    12.2.1 Variability/wandering constraint

    12.2.2 Constraint in management

    12.2.3 Integration

    12.3 Virtual Drum

    12.4 Benefits

    12.4.1 Capacity/simple portfolio planning

    12.4.2 Resolving resource conflicts/simple resource planning and management

    12.4.3 More projects in less time/faster projects/increased capacity

    12.5 Summary

    13 Planning explicit safety buffers

    13.1 Bundling safety buffers

    13.2 Relay runner principle

    13.3 How much safety buffer?

    13.4 Project and integration buffer

    13.5 An aside: Critical path and critical chain

    13.6 In practice

    13.7 Summary

    14 Operational management with robust and synchronized tactical priorities

    14.1 The necessity of tactical priorities

    14.2 Requirements for tactical priorities

    14.3 Identifying tactical priorities

    14.3.1 Project progress

    14.3.2 Safety buffer consumption and recovery

    14.3.3 Project status/buffer index

    14.3.4 Task priorities

    14.4 Task management

    14.4.1 Task lists

    IP—In Process

    NS—Not Started

    NTBS—Not To Be Started

    14.4.2 Task manager—daily routine

    14.5 Project management

    14.5.1 Task lists

    IP—In Process

    NS—Not Started

    NTBS—Not To Be Started

    14.5.2 Project manager interventions

    14.5.3 Fever chart

    14.5.4 Changes to the project plan

    14.6 Effects on atmosphere and working relationships

    14.7 Top management intervention

    14.8 Project status

    14.8.1 Escalated tasks

    14.8.2 Flow trend

    14.9 Warnings and cautions

    WIP management is a prerequisite

    Clients and suppliers can become the constraint

    Systems support is required

    14.10 Summary

    15 PROJECTSFLOW®—Summary

    Managing WIP

    Explicit safety buffers

    Synchronized tactical priorities/managing implementation

    Conclusion

    16 Worksheets and templates

    16.1 Cause & effect

    16.1.2 Planning explicit safety buffers

    16.1.3 Operational management through robust and synchronized tactical priorities

    16.1.4 The future in multi-project management

    16.2 Resolved operation and decision conflicts

    Employee: Include and use up safety buffers?

    Project managers: Withdraw resources from other projects?

    Resource managers: Increase capacity?

    Resource managers: Show idle capacities?

    Resource managers: Promise more than the business can achieve?

    Resource managers: Allow or prevent BM/PBS?

    Project vs. resource managers: Launch projects despite insufficient preparation?

    16.3 Benefits

    16.4 Negative side effects

    16.5 Obstacles/stumbling blocks during implementation

    Part 3Transformation

    17 Introduction: Transformation

    Cross-references and revision

    18 From a conventionally run to a high-performance organization

    Necessity (why the change is needed)

    Objective (what we are trying to achieve with the change)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Phase 2: Integrating good preparation into daily life

    Phase 3: Transforming management

    Phase 4: Transforming management

    Phase 5: Clients and suppliers

    Phase 6: Increasing capacity

    Caution! (what is often ignored but must absolutely be taken into account)

    19 Phase 1: Reducing WIP

    Necessity (why this phase is needed)

    Objective (what we are trying to achieve with this phase)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Predicted effect (the specific effect that will be created by the change)

    Caution! (what is often ignored but must absolutely be taken into account)

    19.1 Step 1.1: Freezing projects

    Necessity (why the step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Predicted effect (the specific effect that will be created by the implementation)

    Caution! (what is often ignored but must absolutely be taken into account)

    19.2 Step 1.2: Accelerating projects

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Predicted effect (the specific effect that will be created by the implementation)

    19.3 Step 1.3: Defrosting projects

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Predicted effect (the specific effect that will be created by the implementation)

    19. 4 Step 1.4: Starting new projects

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    19.5 Phase 1 Summary

    Objective (what we are trying to achieve with this phase)

    Path (how to reach the objective)

    Predicted effect (the specific effect that will be created by the implementation)

    19.6 Conclusion

    20 Phase 2: Good Preparation

    Necessity (why this phase is needed)

    Objective (what we are trying to achieve with this phase)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Caution! (what is often ignored but must absolutely be taken into account)

    20.1 Step 2.1: Thoroughly prepare active projects

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with the change)

    Assumptions (why it is possible—though not easy—to reach the goal)

    Path (how to reach the objective)

    Predicted effect (the specific effect that will be created by the implementation)

    20.2 Step 2.2: Defining good preparation

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Predicted effect (the specific effect that will be created by the implementation)

    20.3 Step 2.3: Dealing with worried clients

    Necessity (why the change is needed)

    Objective (what we are trying to achieve with the change)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    20.4 Phase 2 Summary

    Objective (what we are trying to achieve during this phase)

    Path (how to reach the objective)

    Predicted effect (the specific effect that will be created by the implementation)

    20.5 Conclusion

    21 Phase 3: Transforming Planning

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this phase)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Caution! (what is often ignored but must absolutely be taken into account)

    21.1 Step 3.1: Creating project network plans

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Detail vs. clarity

    Path (how to reach the objective)

    21.2 Step 3.2 Explicit safety buffers, critical chain

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Caution! (what is often ignored but must absolutely be taken into account)

    21.3 Step 3.3: Staggering projects

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    21.4 Step 3.4: Integrating new projects

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    21.5 Phase 3 Summary

    Objective (what we are trying to achieve with this step)

    Path (how to reach the objective)

    Expected effect (the specific effect that will be created by the implementation)

    21.6 Conclusion

    22 Phase 4: Transforming management

    Necessity (why this phase is needed)

    Objective (what we are trying to achieve with this phase)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Caution! (what is often ignored but must absolutely be taken into account)

    22.1 Step 4.1 Progress reporting

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Expected effect (the specific effect that will be created by the implementation)

    22.2 Step 4.2: Task management

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Expected effect (the specific effect that will be created by the implementation)

    22.3 Step 4.3: Project management

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Expected effect (the specific effect that will be created by the implementation)

    22.4 Step 4.4: Top management

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    22.5 Step 4.5: Adjusting speed

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    22.6 Phase 4 summary

    Objective (what we are trying to achieve with this step)

    Path (how to reach the objective)

    Expected effect (the specific effect that will be created by the implementation)

    22.7 Conclusion

    23 Phase 5: Clients and suppliers

    Necessity (why this phase is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Caution! (what is often ignored but must absolutely be taken into account)

    23.1 Step 5.1: Mitigating and reducing harmful client influences

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    23.2 Step 5.2: Outsourced sub-projects

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Expected effect (the specific effect that will be created by the implementation)

    23.3 Step 5.3: Fast and reliable suppliers

    Objective (what we are trying to achieve with this step)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Caution! (what is often ignored but must absolutely be taken into account)

    23.4 Phase 5 Summary

    Objective (what we are trying to achieve with this step)

    Path (how to reach the objective)

    23.5 Conclusion

    24 Phase 6: Increasing capacity

    Necessity (why this phase is needed)

    Objective (what we are trying to achieve with this phase)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Caution! (what is often ignored but must absolutely be taken into account)

    24.1 Step 6.1: Improving processes

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    Predicted effect (the specific effect that will be created by the implementation)

    24.2 Step 6.2: Developing resources

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    24.3 Step 6.3: Sprint

    Necessity (why this step is needed)

    Objective (what we are trying to achieve with this step)

    Assumptions (why it is possible—though not easy—to reach the objective)

    Path (how to reach the objective)

    24.4 Phase 6 Summary

    Objective (what we are trying to achieve with this phase)

    Path (how to reach the objective)

    24.5 Conclusion

    25 Transformation process—Summary

    Objective (what we are trying to achieve with this change)

    Path (how to reach the objective)

    Predicted effect (the specific effect that will be created by the implementation)

    26 QuiStainable Change QuiStain® is a registered trademark of VISTEM GmbH & Co. KG.

    26.1 Resistance to change

    26.2 Requirements for significant improvement initiatives

    26.3 WIP improvement

    26.4 High speed implementation

    27 Summary and Outlook

    1. More efficiency through simple principles

    2. Project portfolio and resource capacity management

    3. Increasing capacity

    Challenges in the transformation process

    28 References

    28.1 Reference list

    28.1 Further reading

    Acknowledgements

    With the founding and development of the Theory of Constraints and Critical Chain Project Management, Dr. Eliyahu M. has put down the basis for my reflections and explanations.

    Sanjeev Gupta and his team from Realization Technologies Inc. have repeatedly distilled and passed on the extensive experiences they have collected across the globe.

    Jaideep Srivastav has allowed me deep insights into the dynamics of change processes.

    Dr. Georg Angermeier has offered me helpful advice with many of my articles to ensure a reader-focused structure.

    Claudia Simon, Jens-Oliver Schumacher, and Gerhard Stix have assisted me with the early versions of texts found in this book.

    Rudolf G. Burkhard, Franz Nowak, and Wolfram Müller have always provided thoughtful feedback on my presentations and articles.

    Claudia Simon and the VISTEM office team have supported me in every phase of the creation of this book, through many ups and downs.

    My heartfelt thanks to all of them.

    Uwe Techt

    März 2015

    1               Introduction

    Projects can go over budget, exceed deadlines, or deliver restricted features and quality. This can result in economic damage for companies and their clients.

    The difficulties arise at source. Established metrics and management methods slow projects down by creating conflicts in operations and decision-making.

    A radically new approach is needed; one that features:

    ·         Simple, constraint-oriented management

    ·         Clear, robust priorities

    ·         Company-wide, rather than locally focused optimization

    ·         A focus on speed, on ProjectsFlow®

    Discover how you can:

    ·         complete more projects with the same amount of resources;

    ·         reliably deliver all projects to specs; and

    ·         significantly shorten project lead times.

    In Part 1, The reality of a multi-project organization, I describe the typical current situation of a multi-project organization, including:

    ·         Typical problems experienced in project management, their impact, and potential benefits of improvements

    ·         Interactions and cause-and-effect relationships

    In Part 2, The future of multi-project management, you will find out under which