Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 The Site of the Terminal Station. Paper No. 1157
()
Related to Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 The Site of the Terminal Station. Paper No. 1157
Related ebooks
Transactions of the American Society of Civil Engineers, Vol. LXVIII, Sept. 1910 The New York Tunnel Extension of the Pennsylvania Railroad. The East River Division. Paper No. 1152 Rating: 0 out of 5 stars0 ratingsScientific American Supplement, No. 384, May 12, 1883 Rating: 0 out of 5 stars0 ratingsScientific American Supplement, No. 384, May 12, 1883 Rating: 0 out of 5 stars0 ratingsTransactions of the American Society of Civil Engineers, Vol. LXX, Dec. 1910 A Concrete Water Tower, Paper No. 1173 Rating: 0 out of 5 stars0 ratingsTransactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 The Bergen Hill Tunnels. Paper No. 1154 Rating: 0 out of 5 stars0 ratingsReport of the Several Works Connected with the Draining, Paving & Lighting the Parish of Saint Mary Abbotts, Kensington, 1856 Rating: 0 out of 5 stars0 ratingsScientific American Supplement, No. 470, January 3, 1885 Rating: 0 out of 5 stars0 ratingsTransactions of the American Society of Civil Engineers, vol. LXX, Dec. 1910 Reinforced Concrete Pier Construction Rating: 0 out of 5 stars0 ratingsScientific American Supplement, No. 810, July 11, 1891 Rating: 0 out of 5 stars0 ratingsScientific American Supplement, No. 497, July 11, 1885 Rating: 0 out of 5 stars0 ratingsScientific American Supplement, No. 586, March 26, 1887 Rating: 0 out of 5 stars0 ratingsA Guide to Some of the Equations used in Constructing a Suspension Bridge Rating: 0 out of 5 stars0 ratingsElements of Plumbing Rating: 5 out of 5 stars5/5The life of Isambard Kingdom Brunel, Civil Engineer Rating: 0 out of 5 stars0 ratingsEncyclopaedia Britannica, 11th Edition, Volume 11, Slice 6 "Geodesy" to "Geometry" Rating: 0 out of 5 stars0 ratingsScientific American Supplement, No. 392, July 7, 1883 Rating: 0 out of 5 stars0 ratingsScientific American Supplement, No. 531, March 6, 1886 Rating: 0 out of 5 stars0 ratingsScientific American Supplement, No. 794, March 21, 1891 Rating: 0 out of 5 stars0 ratingsScientific American Supplement, No. 794, March 21, 1891 Rating: 0 out of 5 stars0 ratingsBroad Gauge Railways Rating: 0 out of 5 stars0 ratingsScientific American Supplement, No. 458, October 11, 1884 Rating: 0 out of 5 stars0 ratingsUnderground Rating: 4 out of 5 stars4/5Scientific American Supplement, No. 303, October 22, 1881 Rating: 0 out of 5 stars0 ratingsScientific American Supplement, No. 514, November 7, 1885 Rating: 0 out of 5 stars0 ratings
Reviews for Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 The Site of the Terminal Station. Paper No. 1157
0 ratings0 reviews
Book preview
Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 The Site of the Terminal Station. Paper No. 1157 - George C. Clarke
The Project Gutenberg EBook of Transactions of the American Society of
Civil Engineers, vol. LXVIII, Sept. 1910, by George C. Clarke
This eBook is for the use of anyone anywhere at no cost and with
almost no restrictions whatsoever. You may copy it, give it away or
re-use it under the terms of the Project Gutenberg License included
with this eBook or online at www.gutenberg.org
Title: Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910
The Site of the Terminal Station. Paper No. 1157
Author: George C. Clarke
Release Date: May 17, 2006 [EBook #18408]
Language: English
*** START OF THIS PROJECT GUTENBERG EBOOK SOCIETY OF CIVIL ENGINEERS ***
Produced by Louise Hope, Juliet Sutherland and the Online
Distributed Proofreading Team at http://www.pgdp.net
Page numbers in [brackets] represent full-page illustrations or unpaginated plates, here placed as close as practicable to their referring text.
The larger illustrations are shown as thumbnails linked to the full-size version.
AMERICAN SOCIETY OF CIVIL ENGINEERS
INSTITUTED 1852
TRANSACTIONS
Paper No. 1157
THE NEW YORK TUNNEL EXTENSION OF THE
PENNSYLVANIA RAILROAD.
THE SITE OF THE TERMINAL STATION.
¹
By George C. Clarke, M. Am. Soc. C. E.
The purpose of this paper is to describe the preliminary work for and the preparation of that portion of the site for the Terminal Station in Manhattan, of the New York Tunnel Extension of the Pennsylvania Railroad, which was constructed under the direction of the Chief Engineer of the East River Division, including the disposal of material excavated from all parts of the Terminal construction and the tunnels on the East River Division.
As outlined in the paper by Brigadier-General Charles W. Raymond, M. Am. Soc. C. E., Chairman of the Board of Engineers, the track yard of the station, Plate LIII, extends from the east line of Tenth Avenue eastward to points in 32d and 33d Streets, respectively, 292 and 502 ft. east of the west line of Seventh Avenue. The width of the available area at track level at Tenth Avenue is 213 ft., continuing at this width to within 182 ft. of the west line of Ninth Avenue, where, by an offset toward the south, it is increased to 355 ft. This width is held to a point 5 ft. east of the east line of Ninth Avenue, where, by an offset toward the north, it is increased to 509 ft., which width continues to the west line of Seventh Avenue, where it divides into two fan-shaped areas. The north area has a width of about 170 ft. and the south one, 160 ft., at the house line, each area tapering gradually to the width of the standard three-track tunnel at the east ends, noted above in 33d and 32d Streets. Additional track room for four tail-tracks is gained by the construction of two double-track tunnels under Ninth Avenue at 33d Street, their center lines being parallel to the street and 45.5 and 84.5 ft. distant, respectively, from the north house line. An additional width of 24.5 ft. is occupied on the north from 277.5 ft. to 543.5 ft. west of the west line of Seventh Avenue, where the buildings on the north side of 33d Street have been torn down and the enclosing wall set back in anticipation of a future outlet to 34th Street; and on the south, from 459 ft. to 597 ft. west of the west line of Seventh Avenue a rectangular offset of 124 ft. encloses the area occupied by the Service Building. The total area above outlined is the space occupied at track level, and amounts to 28 acres, of which the portion west of the east house line of Ninth Avenue and south of a line 107.3 ft. south of the south line of 33d Street is a part of the North River Division, and was constructed under the direction of the engineers of that Division; the fan-shaped areas east of the west house line of Seventh Avenue were constructed under the direction of the Chief Engineer of Electric Traction and Terminal Station Construction.
Plate LIII.
Pennsylvania Station, New York City:
Plan Showing Area at Track Level
In June, 1903, when the writer's connection with the work began, the preliminary surveys had been completed and the location and extent of the Terminal track area had been fixed, in so far as the city blocks to be occupied were concerned. This contemplated area, however, did not include the portion between Ninth and Tenth Avenues, that being added subsequently. The elevation of the track level had also been fixed by the requirement in the agreement with the City that no part of the permanent structure should approach within 19 ft. of the surface under any avenue or under any street except within the Terminal area. The nearest approach of the tracks to the surface is at a point 320 ft. east of Eighth Avenue, where the top of the rail is 40 ft. below the 31st Street curb line.
Wash-Borings.
The general plan of enclosing the area in retaining walls having been adopted, wash-borings were taken, for the purpose of determining the best location for the walls, the depth of rock, and the nature of the material overlying it. These borings were made along both curb lines of Seventh Avenue, the east curb line of Ninth Avenue, the north curb line of 33d Street, and the south curb line of 31st Street. The borings, as a rule, were taken at intervals of approximately 100 ft., some deviation in these intervals being made in order to prevent injury to water, gas, and sewer connections, and, if the elevation of the surface of the rock, as determined by one of these borings, corresponded fairly well with the borings on either side of it, no intermediate borings were taken. When a discrepancy appeared, a boring was taken midway between the two non-corresponding ones, and if the information obtained from the intermediate boring failed to account for the discrepancy, others were taken at the quarter points of the original 100-ft. interval.
The dotted