Frant station
irst opened in 1851, Frant station remains in use today with one train per hour each way, augmented with additional peak hour services, all of which are provided by Southeastern. Being located on the Tonbridge-Hastings line, the station would have been served by the narrow-body Hastings gauge DEMUs on a peak hour basis only. After electrification in 1986, train services dramatically improved and became dominated by 4-Cep