Your reports and pictures are most welcome. Highly competitive rates are paid, especially if exclusive to The RM.
THERE has been significant progress in the long-term overhaul of Bagnall 0-4-0ST (2623/1940) at the Foxfield Railway. The boiler successfully underwent hydraulic and steam tests in the late autumn before being reunited with the frames just before Christmas. The loco is now structurally complete, but with several piping jobs to do before steam testing can begin. However, it is expected to be available for