THEWest Somerset Railway was starting emergency repairs and taking legal action after its running line was severed by a landslide following heavy rainfall before Christmas.
The collapse of the embankment occurred on the morning of Tuesday, December 20 at Tribble Bridge alongside the A358 near Combe Florey, a short distance from Bishops Lydeard. It left the line covered in mud and a large