Australian Model Railway Magazine

Reviews

HOn30 E M Baldwin Bo-Bo Sugar cane locomotive by Lyndon’s Trains. Price $200 plus postage. www.lyndonstrains.com/ collections/cane-trains

I have to admit that I am not an expert on Queensland sugar mill tramway operations or their equipment. In my research regarding E M Baldwin and their locomotives, I used the book A guide to Australian Locomotives

(2009 edition) published by the Australian Railway Historical Society, New South Wales.

It would appear that E M Baldwin started as a “backyard operation” in Castle Hill in Sydney. They had a reputation for accomplishing work that other builders were reluctant to take on. The first locomotive they built for Queensland sugar mill tramways was for South Johnston Mill in 1960 and they continued supplying the market until 1983, when they built their last locomotive (TULLY 7) for the Tully Mill.

The model

The kit is based on E M Baldwin’s B-B diesel hydraulic locomotives that were built for numerous sugar cane tramways over the years up to the mid 1970s.

The kit was supplied in a zip lock plastic bag that contained:

• Three pages of instructions

• A modified N scale SW9 chassis

• Brass wire and etchings for handrails

• A decal

You’re reading a preview, subscribe to read more.

More from Australian Model Railway Magazine

Australian Model Railway Magazine3 min read
Diary
For all activities contact Eastern Division representative Graham Windmill on 9626 0351. 13 April Running Session at the home of Tim Stewart, 1 Narambi Close, Berowra Heights. HO NSW layout based on Mudgee in operation. DCC layout. 2pm -5pm. 4-5 May
Australian Model Railway Magazine5 min read
Mailbag
I have been building some Bluebird railcar kits that I bought about seven years ago, which had been languishing on the shelf while the layout was being constructed. When I had almost finished the first one, I blithely sprayed the whole railcar with c
Australian Model Railway Magazine9 min read
Putting The O In Casterton Part 9: Point Modifications And Electrics
Despite all the careful planning, somewhere, in the back of my mind, I had a nagging feeling that a costly mistake was going to occur at some stage. So far, I’d built up about 30 turnouts, which is about a third of what will be required. They are all

Related