Heritage Railway

New Grange boiler passes steam test at Tyseley

NEW-BUILD GWR 4-6-0 No. 6880 Betton Grange passed its steam test on Friday, December 6 – paving the way for the locomotive to be reassembled at the Llangollen Railway, where it could make its debut in 2020.

A project landmark was reached on Friday, November 15 when the boiler passed its hydraulic test at Tyseley Locomotive Works, coinciding with the 6880 Betton Grange Society Ltd’s annual meeting there the following

You’re reading a preview, subscribe to read more.

More from Heritage Railway

Heritage Railway1 min read
Aberdeen Tram Tracks Are Rediscovered During Road Resurfacing Works
TRACKS from a long-closed Aberdeen tramway route have been uncovered after being buried for more than 60 years. The tramline was rediscovered by workers resurfacing the carriageway in Holburn Street and are believed to be part of the Bridges route. I
Heritage Railway4 min read
Big Shunt For May Opening At Locomotion's New Hall
THE National Railway Museum has orchestrated its biggest-ever shunt to create Europe's largest undercover display of historic rail vehicles in time for the public opening of the Locomotion museum in Shildon's £8 million New Hall on Friday, May 24. Ma
Heritage Railway2 min read
Liverpool Class 507 Which Carried Elizabeth II Is Saved
THE Liverpool-based Class 507 Preservation Society has reached an agreement to take over the ownership of a Merseyrail EMU before the last of its type is withdrawn and scrapped. No. 507001, which carried the late Queen Elizabeth II from Moorfields st

Related