Rail Express

Power by the Hour

Europorte

Out of traffic since 2001, 92040 was collected from Loughborough on August 16th, being taken south by road to Eurotunnel’s maintenance depot at Cheriton.

Freightliner

Ensconced at Brush Traction’s Falcon Works since December 2008, and having not worked a train since the end of 2006 when it suffered a power unit failure, 57001 was finally released from Loughborough on August 5th. Haulage to Basford Hall was provided by 66504, itself fresh off an engine change top 66516 on the 4O29 Trafford Park to Southampton as far as Basford Hall. The loco is now stabled at Crewe awaiting developments.

You’re reading a preview, subscribe to read more.

More from Rail Express

Rail Express24 min read
Headline News
A much-needed order for additional trains for the Elizabeth Line could be placed with Alstom by the end of May, with the trains built at Derby Litchurch Lane. Concern for the future of the site had been raised after the final Class 730 was completed,
Rail Express5 min read
Freightliner trials Class 18
FREIGHTLINER has become the second company to take a Class 18 hybrid shunter on trial, with No. 18006 arriving at Crewe Basford Hall on April 9. The Clayton-built locomotive had departed from Wolverton Works the previous day to start what Rail Expres
Rail Express14 min read
Labour’s Plans For Taking Control Of The Railways
RAILWAYS have perhaps never dominated the national news as much as they have in recent times. Industrial action, the future of factories in this country, the opening of the Elizabeth Line, the construction of High Speed 2, the cancellation of HS2 nor

Related