The Railway Magazine

CLASS 195 DMUs AND 331 EMUs

FOR several years, passengers have taken the promise from Government and the rail industry ‘Pacers’ will be replaced’ with a pinch of salt. With several delays and false starts, who can blame them? However, the reality is that the ‘Pacer’ replacement programme has finally begun.

On July 1, Northern (a franchise operated by Arriva) introduced its new Class 195 DMU and Class 331 EMU on to nine diagrams.

When the invitation to tender for the next Northern franchise period from April 2016 was issued, it was stipulated the new franchisee had to replace the Class 142/144 ‘Pacer’ fleet. Not only were they life expired, but by the end of 2019 they would no longer meet changing disability regulations. In addition, passengers have higher aspirations in respect of train travel, and expect and deserve better. The new trains begin

You’re reading a preview, subscribe to read more.

More from The Railway Magazine

The Railway Magazine1 min read
Sidelines
CLASS 18 No. 18006 was delivered to Freightliner at Crewe Basford Hall on April 9. It was dispatched from Wolverton by Beacon Rail, which owns all 15 members of the class of battery-diesel hybrid shunting locos, built for it by Clayton Equipment Ltd.
The Railway Magazine11 min read
Neville Hill 125 Years Old And Still Evolving
AS the 19th century drew to a close, the North Eastern Railway concluded that it needed another depot in Leeds to augment capacity. Accommodation at the former Leeds and Thirsk Railway’s Holbeck depot (about half-a-mile north of the ex-North Midland
The Railway Magazine8 min read
West Coast wires
MAY 6 marks 50 years since electrified services were introduced to the full 401-mile West Coast Main Line from London Euston to Glasgow Central, but its fortunes as a key Anglo-Scottish artery since then have not always been rosy. Electrification of

Related