IARNROD EIREANN / IRISH RAIL
Jun 18, 2019
1 minute
■ MPV WEEDSPRAY: Systemwide weedspray duties this spring have been carried out by MPV No. 790 rather than by the loco-hauled weed control train. The MPV traversed the Mallow to Tralee ‘Kerry
You’re reading a preview, subscribe to read more.
Start your free 30 days