Rail Express

IN BRIEF

NEW PLATFORMS OPEN AT WAVERLEY

EDINBURGH Waverley’s newly-extended platforms 5 and 6 opened for use at the beginning of March. The east side bay platforms have been extended into the station (along a former taxi road, see photo below) to accommodate 10-car Class 800/801 trains. The work involved removing 16,000 tons of material and laying 7,000 tons of ballast for new track. Platform capacity is at a

You’re reading a preview, subscribe to read more.

More from Rail Express

Rail Express7 min read
DB Cargo UK to sell 47 Class 60s
ALMOST 50 Class 60s have been put up for sale by DB Cargo UK. The operator’s chief executive Andrea Rossi had confirmed earlier this year that DBC would look to dispose of redundant locomotives (RE334). Ten Class 67s, 12 Class 90s and 16 Class 60s ha
Rail Express7 min read
Belfast Terminal To Close But Grand Central Won’t Be Ready To Replace It
GREAT Victoria Street (GVS) in Belfast is planned to close in mid-May, however Translink has confirmed that trains will not be using its replacement, the new £200 million Belfast Grand Central, until the autumn. Construction and fitting out of the ne
Rail Express8 min read
A Brace Of ‘Dace’
KIT BUILDING has numerous benefits for railway modellers, and saving money over buying ready to run models is the last of them! More importantly, kit-built rolling stock will fill gaps in signature vehicles for a given era and location. Southern Regi

Related