The Railway Magazine

Thameslink franchise not delivering value for money

railmaguk1802_article_010_01_01

AN IN-DEPTH report by the National Audit Office (NAO) into the Thameslink, Southern and Great Northern (TSGN) rail franchise has revealed it has not delivered value for money as a result of high levels of passenger disruption.

The report also concludes that between September 2014 and September 2017 passengers using the franchise have experienced the worst service performance on the national rail network, with around 146,000 services (7.7% of those planned) having either been cancelled or been

You’re reading a preview, subscribe to read more.

More from The Railway Magazine

The Railway Magazine12 min read
Remembering The All-line Timetable
“FOR the first time since the demise of the Bradshaw’s Guide, Britain once again has a single comprehensive rail timetable – only this time it is the official book issued by the operator,” reported The Railway Magazine 50 years ago. Known internally
The Railway Magazine3 min read
End Of The Line
AFTER 98 years, peat haulage by rail came to an end on Bord na Móna (BnM) on March 29, when the last load of peat was hauled off the Bellair System near Ballycumber, Co. Offaly. Several locomotives had been transferred in by rail after being made red
The Railway Magazine11 min read
Neville Hill 125 Years Old And Still Evolving
AS the 19th century drew to a close, the North Eastern Railway concluded that it needed another depot in Leeds to augment capacity. Accommodation at the former Leeds and Thirsk Railway’s Holbeck depot (about half-a-mile north of the ex-North Midland

Related