Fast Bikes

PROJECT NINJA

It’s time for a bit of a progress update on my Z X R project and things are moving along fairly quickly. After getting the swingarm fitted last time I could start to think about the shock and linkage arrangement. I had already acquired a ‘new old stock’ (that’s what NOS means on eBay apparently, nothing to do nitrous) FO Racing shock. G iven that these were made in the early 90s my first job was to give it a good once over and take it into work for a re-gas as it was bound to have made an escape after 2 5 odd

You’re reading a preview, subscribe to read more.

More from Fast Bikes

Fast Bikes1 min read
Best Bsb Track?
Hi guys, I’m a big BSB fan but have never actually been to a race track to watch the action. I want to change that this year, but the question is what circuit should I go to? I’m based in the Midlands, so there are a few around me. It'd be great to g
Fast Bikes1 min read
Fast Bikes
EDITORIAL Editor: Bruce Wilson, bwilson@mortons.co.uk Designer: Michael Baumber Production Editor: Lucy Wood CONTRIBUTORS Words: Steve Parrish, Tim Neave, Tom Neave, Jon Urry, Andrew Dalton, Jack Thompson, Gary Hohnson, Christian Iddon, Jack Fairman,
Fast Bikes8 min read
Rating Rubber….
MICHELIN POWER 6 & POWER GP2 Elsewhere in this issue, and in many other issues of Fast Bikes, you’ll read about the fantastic new and used bikes we celebrate and enjoy. We marvel at their engineering and performance, and how, with the relentless marc

Related Books & Audiobooks