12 min listen
The Crude Report: Pipeline capacity goes from famine to feast
FromArgus Media
ratings:
Length:
20 minutes
Released:
Dec 1, 2021
Format:
Podcast episode
Description
What began as a frenzy to build crude oil pipelines connecting US oil fields like the Permian basin to ports for export has resulted in more pipeline capacity than the crude to fill it.
In this episode of The Crude Report, our vice president Jeff Kralowetz and Petroleum Transportation North America editor Chris Baltimore go over the latest developments with the US Wink-to-Webster, Capline and DAPL pipelines, and the Trans Mountain expansion and Enbridge Line 3 replacement projects in Canada.
In this episode of The Crude Report, our vice president Jeff Kralowetz and Petroleum Transportation North America editor Chris Baltimore go over the latest developments with the US Wink-to-Webster, Capline and DAPL pipelines, and the Trans Mountain expansion and Enbridge Line 3 replacement projects in Canada.
Released:
Dec 1, 2021
Format:
Podcast episode
Titles in the series (100)
Cushing: The heart of US crude is still beatin’: Crude is rushing past Cushing on its way to the coast, but the traditional price setting center of the US oil industry is likely to maintain its role for years to come. The Nymex futures contract for light sweet crude oil delivering at Cushing is str... by Argus Media