78 min listen
HTWOW JANUARY 2023
ratings:
Length:
86 minutes
Released:
Feb 8, 2023
Format:
Podcast episode
Description
EPISODE 66
Welp, this year’s already a doozy as this balls late pod attests. Dave and Toby may be behind schedule, but the first episode of 2023 is still features a dynamite set of tunes, including a new lost track from 90s indie faves Ivy. Plus we check in with Dave’s latest attempt to drop his dad bod.
THE TUNES
The Cure – “High” (intro/outro)
Ladytron – “City Of Angels”
Ivy – “Sleeping Late”
Belle And Sebastian – “I Don’t Know What You See In Me”
Local Natives – “Just Before The Morning”
THE BEERS
(provided by Goodfriend Package)
Waterloo Lemon Lime Sparking Water
Lunazul Blanco Tequila
www.oldwaver.com
htwowpod@gmail.com
www.patreon.com/htwow
Welp, this year’s already a doozy as this balls late pod attests. Dave and Toby may be behind schedule, but the first episode of 2023 is still features a dynamite set of tunes, including a new lost track from 90s indie faves Ivy. Plus we check in with Dave’s latest attempt to drop his dad bod.
THE TUNES
The Cure – “High” (intro/outro)
Ladytron – “City Of Angels”
Ivy – “Sleeping Late”
Belle And Sebastian – “I Don’t Know What You See In Me”
Local Natives – “Just Before The Morning”
THE BEERS
(provided by Goodfriend Package)
Waterloo Lemon Lime Sparking Water
Lunazul Blanco Tequila
www.oldwaver.com
htwowpod@gmail.com
www.patreon.com/htwow
Released:
Feb 8, 2023
Format:
Podcast episode
Titles in the series (77)
HTWOW DEPECHE MODE FRONT 242 BONUS EPISODE: EPISODE 3 Dave and Toby preview shows by Depeche Mode 9/22 at Starplex and Front 242 9/24 at Granada Theater in Dallas, reminisce about discovering synthpop in the 80s and how Depeche Mode invented reality TV. THE TUNES Depeche Mode - "Never Let Me Down ... by HIGH T WITH OLD WAVER