In this podcast, Ricardo introduces the main concepts of PERT Analysis, mechanism of calculation that uses the optimist, most probable and pessimistic duration in order to determine the expected duration of the task, allowing that the statistical concepts of standard deviation and variance be determined and then, the numerical probability of project duration accomplishment be calculated. This podcast was recorded only in Brazilian Portuguese. The link below is for the Brazilian Portuguese version.