WHILE the overhaul of Peppercorn A1 Pacific No. 60163 Tornado has experienced setbacks, and is now on the final straight, the remaining jobs have taken longer than envisaged and its Easter appearance on the NeneValley Railway has had to be rescheduled.
The start of March saw work continuing