Australian Model Railway Magazine

Steel train operations on the Cassino layout

The Steel train operations

One of my favourite trains on the layout is the Steel train.

Up empty steel train - Acacia Ridge yard to Grafton yard

The sequence of my steel train starts with an Up empty steel train (Train No.8) in track two (a return loop) in Acacia Ridge yard, departing south to Grafton yard where it stages until later in the session. This is sequence number five in the timetable departing Acacia Ridge yard at 01:20, due to arrive at Grafton yard track two (also a return loop) about 05:10. This roster enables you to travel the whole layout.

This train

You’re reading a preview, subscribe to read more.

More from Australian Model Railway Magazine

Australian Model Railway Magazine1 min read
Yarra Valley Model Railway Club Exhibition report
The Yarra Valley Model Railway Club held its annual exhibition over the Easter long weekend, March 30th and 31st, with an impressive 62 exhibits and trade stands in attendance. Layouts included; Brett Watson's re-built ‘Dungog’ NSW, Matt Winzenied's
Australian Model Railway Magazine4 min read
Time Invested
As I approach construction of what will probably be my last large layout, I’ve been putting some thought into the construction methods I would use on the structures. Over time, one of my favourite aspects of the hobby has been scratch building struct
Australian Model Railway Magazine1 min read
Australian Model Railway Magazine
Managing Editor Scott Fitzgerald Editorial Assistant Ben Gray Editorial Assistant Jacob Franklin Consultants Chris Jones Office Manager Melissa Cullen Subscription and Sales Coordinator Karen Baldini Illustrators Ian Thorpe Design Keith Pennington De

Related