Homebuilding & Renovating

OLD HOUSE, NEW HOME RENOVATING AN EDWARDIAN HOME

EXPERT ADVICE

When buying an Edwardian house in need of modernisation, be aware that, despite their charm, these period properties are not always in the best condition. In some cases, the original features may have been removed entirely by rather misguided previous owners. The Edwardian period ran from 1901 to 1910 (sometimes extended to 1914) which was a short span of time when compared to other architectural periods and house styles. Unlike the Victorian period that preceded it, the Edwardian years saw a far more pared-back approach being taken to house design, as well as in the interior schemes that were favoured — something that was influenced by the Arts and Crafts Movement. As such, taking on an Edwardian renovation can differ from renovating a Victorian house. Despite that, the Edwardian home has certainly made its mark and the UK still boasts some beautiful examples of Edwardian houses.

Here, we take a look at the top 10 most common features (both good and bad) of Edwardian renovation projects. This article will give you ideas on how to bring

You’re reading a preview, subscribe to read more.

More from Homebuilding & Renovating

Homebuilding & Renovating5 min read
Creating A Broken-plan Layout
While the concept of broken-plan living is still seen as relatively new on the house design scene, it is actually an idea that has grown considerably in popularity in recent years — and for good reason. This type of layout holds many benefits compare
Homebuilding & Renovating4 min readArchitecture
Affordable Extensions
A 12m ² open-plan kitchen/dining/living rear extension, clad in charred larch and connected to the garden by a stepped deck, has transformed the Clifford family’s 1930s semi-detached Devon home. “It’s quite a tricky, sloping site, but local company B
Homebuilding & Renovating4 min read
Level Best
HOMEOWNERS Stephen and Helen Surtees LOCATION South Yorkshire PROJECT Self-build bungalow SIZE 289m ² (including garage) BUILD ROUTE Built by main contractor CONSTRUCTION SIPs panel system with masonry outer leaf BUILD TIME 15 months PLOT/HOUSE COST

Related Books & Audiobooks