AT MIDNIGHT onNovember30, amajor two-day operation swung into action to move Network Rail’s redundant Reedham Junction signalbox 40 miles to the North Norfolk Railway’s Holt terminus.
The classic GER ’box, built in 1904 when the Reedham to Lowestoft line was doubled, was closed in 2019 as part of a scheme to replace all mechanical signalling east of Norwich with modern electronic signalling controlled from Colchester power