Grand Designs Australia

CAUGHT short

a ustralia is facing its worst material shortage in more than 40 years. Dwindling supplies of key building materials such as roof tiles, cement and steel are having a devastating impact on the industry. Building projects are now taking up to 20 per cent longer to finish, and the price of input materials has increased substantially.

THE CAUSES OF SHORTAGE AND DELAY IN MATERIAL SUPPLY:

Loss of timber in bushfires

Australia’s devastating 2019-20 summer bushfires has played a significant role in the

You’re reading a preview, subscribe to read more.

More from Grand Designs Australia

Grand Designs Australia1 min read
The Entertainer
THE USE OF TIMBER ON THE WORK END OF THE BENCH VERSUS STONE ON THE OTHER END this kitchen was designed as part of a renovation. The new design combined the dark-timber chopping block and chairs with the soft timber floors and the white cabinetry to c
Grand Designs Australia3 min read
MADE OF Glass Part Of An Original Sheep Fair
HOUSE Hurdle House LOCATION Alresford, Hampshire, UK arural abode that embodies its country locale in style, this warm, inviting home is tucked into picturesque farmland. Before the renovation, the existing dwelling was made up of a long barn, positi
Grand Designs Australia2 min read
Book It In
Designed by Ettore Sottsass for Memphis Milano in 1981, the iconic Carlton is a bookcase, a chest of drawers and a space divider. Made from timber and covered in decorative laminate, it's as colourful as a rainbow and as functional as they come. With

Related Books & Audiobooks