Rail Express

DEVELOPMENTS

■ DB CARGO: While not on site at Stoke as long as Nos. 966041 and 966210 (see lead story), five-unit WIA car carrier No. 85 70 4971 036-4 finally left the former Marcroft Engineering facility on January 7, having arrived way back in May 2020. The 66-metre-long wagon had been clogging up the busy site awaiting parts. Meanwhile, FKA ‘Megafret’ No. 81 70 4908 009-3 has now been recoded FOA following container

You’re reading a preview, subscribe to read more.

More from Rail Express

Rail Express8 min read
A Brace Of ‘Dace’
KIT BUILDING has numerous benefits for railway modellers, and saving money over buying ready to run models is the last of them! More importantly, kit-built rolling stock will fill gaps in signature vehicles for a given era and location. Southern Regi
Rail Express2 min read
Intermodal Wagon In TT:120 Announced
IN APRIL, Hornby revealed its new TT:120 range for 2024 which includes a useful intermodal wagon which has been constructed in large numbers and sees regular use on Network Rail. The Sffgmss IFA is a single intermodal wagon with drawgear at each end.
Rail Express4 min read
Tata Receives Seventh Clayton
CLAYTON Equipment has completed the construction of the two additional CBD90 shunters ordered by Tata Steel last year, with the departure of the second hybrid machine from its Burtonupon-Trent workshops on March 13. This was delivered to Port Talbot

Related