Rail Express

PRESERVATION

PHIL Civil has been working on his Thomas Hill Vanguard No. 103c at the. With work done to the cooling system, fuel system and a rebuilt air compressor, it has made its first moves under its own power in over 25 years. Since then, it has also received a new set of injectors, replacement fuel pump, starter motor, thermostat and several other jobs. Unlike the other locomotives in the fleet the engine will not be replaced in this one. However, one can never have enough power units and Phil has obtained another Rolls Royce C6, this time from a turkey farm. Purchased as a backup generator it has only run 240 hours since new and with all four locomotives in the fleet having the same engine, it is an ideal spare.

You’re reading a preview, subscribe to read more.

More from Rail Express

Rail Express8 min read
A Brace Of ‘Dace’
KIT BUILDING has numerous benefits for railway modellers, and saving money over buying ready to run models is the last of them! More importantly, kit-built rolling stock will fill gaps in signature vehicles for a given era and location. Southern Regi
Rail Express2 min read
Intermodal Wagon In TT:120 Announced
IN APRIL, Hornby revealed its new TT:120 range for 2024 which includes a useful intermodal wagon which has been constructed in large numbers and sees regular use on Network Rail. The Sffgmss IFA is a single intermodal wagon with drawgear at each end.
Rail Express4 min read
Tata Receives Seventh Clayton
CLAYTON Equipment has completed the construction of the two additional CBD90 shunters ordered by Tata Steel last year, with the departure of the second hybrid machine from its Burtonupon-Trent workshops on March 13. This was delivered to Port Talbot

Related Books & Audiobooks