THE GREAT WESTERN RAILWAY RUABON–BARMOUTH ROUTE PART TWO
At grouping a Great Western steam railmotor took over the erstwhile Cambrian locals to Barmouth across Pont y Bermo. They had been worked conventionally pre-group, partly by one of the three ‘Seaham’ Class 2-4-0Ts or ‘Wrexham tank’ 0-4-4Ts. Lower capacity 48-seat, 59ft railmotors were much used and out-shedded each week at Penmaenpool from Machynlleth. Four cars recorded were Gloucester RC&W-built Diagram ‘Q’ to Swindon drawings. Annual practice saw summer season extensions of some journeys north along the coast line to Dyffryn or Harlech for ‘beach’ trippers. In 1923 an additional excursion platform was built at Barmouth to the south of the level crossing and became the normal departure point for the Dolgelley shuttle. Railmotors were displaced by autos from the summer of 1927. Replacement locomotives were autofitted ‘517’ 0-4-2Ts which in turn gave way to new Collett ‘48XX’ 0-4-2Ts. Summer would see two trailers and the extended journeys up the coast, an evening example as far as Afonwen. In 1923 a loop was installed at Bontnewydd on the ascent east to the summit where the Wnion flowed beside the timber down platform added then. There was an all-wood hipped roof box and a brick main office improved on primitive B&D provision.
Further improvements west of Dolgelley came apace. Barmouth Junction sidings, on the east to south curve of the triangle, were enlarged from just fourteen wagons’ capacity and from one to three roads soon after the GW takeover. Various cheaply constructed wooden bridges, like that at Arthog, were replaced by steel girders. Mawddach shoreline curves were relaid and superelevated so that by 1927 the section to Barmouth Junction was also reclassified as ‘blue’ restriction. The first Churchward Mogul worked through to Barmouth in 1929 when permitted
You’re reading a preview, subscribe to read more.
Start your free 30 days