British Railway Modelling (BRM)

WIRING FOR RELIABILITY

Reliability is something that most of us strive for in our layouts. It means much more than preventing locomotives from stopping or stalling and also includes the capability to quickly diagnose and repair any faults that may occur. This is especially important for those who build and show layouts that regularly travel on the exhibition circuit.

There are many aspects that can affect reliability. A key consideration is ensuring that the electrical power can be delivered from the power source to locomotives and other accessories in a reliable manner. This really means getting some of the fundamental wiring aspects correct from the start and is especially important for those that elect to use DCC.

Electrical reliability can be achieved by addressing many of the aspects detailed here. However, it’s also important to

You’re reading a preview, subscribe to read more.

More from British Railway Modelling (BRM)

British Railway Modelling (BRM)1 min read
Road Vehicles
Most of the road vehicles used on ‘Metcalfe Road’ are either from Oxford or Classix, although several of the lorries have been built from Springside white metal kits. The choice of vehicles on the layout helps define the period being operated, so car
British Railway Modelling (BRM)3 min read
Heljan Class 47
00 1962-present 249.95-389.95 Heljan announced in 2019 that it would produce a completely H new Class 47 model, replacing its previous model from the early 2000s, which, although a very good performer, became known for being overscale in width across
British Railway Modelling (BRM)3 min read
Accurascale Mk. 2b coaches
00 1969-present 59.95 1969 saw the introduction of 111 of the Derby-built Mark 2b coaches in 1 Trailer Second Open (TSO), Corridor First (FK) and Corridor Brake First (BFK) guises as a significant development with their 3’wraparound end doors and no

Related