The Railway Magazine

Disappointing timescales for Waverley Route and other projects

WHAT atreat to read Ashley Butlin’s piece on the Borders Railway, but how I groan at timescales involved in any future expansion.

It took 46 years after the Beeching closure to reinstate a truncated section of the Waverley Line, much of it single track,

You’re reading a preview, subscribe to read more.

More from The Railway Magazine

The Railway Magazine2 min read
Landslip Watch
NETWORK Rail is to spend £22 million improving drainage across its East Coast route, to help prevent major disruption brought to passengers by landslips and heavy rain. There have been multiple incidents of landslips and flooding over the past year a
The Railway Magazine3 min read
End Of The Line
AFTER 98 years, peat haulage by rail came to an end on Bord na Móna (BnM) on March 29, when the last load of peat was hauled off the Bellair System near Ballycumber, Co. Offaly. Several locomotives had been transferred in by rail after being made red
The Railway Magazine12 min read
Remembering The All-line Timetable
“FOR the first time since the demise of the Bradshaw’s Guide, Britain once again has a single comprehensive rail timetable – only this time it is the official book issued by the operator,” reported The Railway Magazine 50 years ago. Known internally

Related Books & Audiobooks