Boiler crisis at the Bure Valley
Feb 16, 2021
2 minutes
By Roger Melton
THE Bure Valley Railway (BVR) has been making headway with an appeal to raise £25,000 to build a new boiler for 2-6-2 No. 7 Spitfire.
In January 2020 the BVR ordered a new ZB-type boiler from North Bay Engineering in Darlington as a spare to facilitate quicker
You’re reading a preview, subscribe to read more.
Start your free 30 days