Moorsline’s new Bridge 27 delivered to site by rail
Feb 11, 2020
1 minute
A REPLACEMENT for the North Yorkshire Moors Railway’s Bridge 27 has been installed.
The newly-fabricated 83-ton structure was constructed by Darlington-based Cleveland Bridge UK as a replacement
You’re reading a preview, subscribe to read more.
Start your free 30 days