The Railway Magazine

1,500 vehicles fail to meet revised accessibility rules

DISPENSATIONS have been provided for on-going use of 1,500 rail vehicles which have either not been modified or not been replaced by new vehicles, according to information released by the Department for Transport on December 31.

Despite having had 10 years to prepare its stock to meet the new PRM (Person of

You’re reading a preview, subscribe to read more.

More from The Railway Magazine

The Railway Magazine2 min read
Colne Valley Viaduct crosses the Grand Union Canal
DECK construction work for HS2’s 2.1-mile long Colne Valley Viaduct has just over half-a-mile to go after it reached the point where the structure crosses the Grand Union Canal at the end of March. By the time of it bridging the waterway near Denham
The Railway Magazine3 min read
Steam Loco Fleet Strengthened
THE Aln Valley Railway’s (AVR) steam locomotive fleet has been boosted by the news that the Northumberland line will be the new home for Hudswell Clark 0-6-0ST, Renishaw Ironworks No.6, works number 1366 built in 1919. The locomotive, along with fell
The Railway Magazine7 min read
Void Filled After Derailment
FOLLOWING the derailment of a Northern Rail Class 195 on March 22 near Grangeover-Sands, Network Rail has undertaken extensive repairs to the permanent way which took a month, the line reopening on April 22. Two Class 195s – Nos. 195104/133 – were wo

Related