The Railway Magazine

Welsh Pony restoration resumes at Ffestiniog – steam return in 2020?

WORK has resumed on reconstructing Ffestiniog Railway’s (FR) England 0-4-0ST 1867-built Welsh Pony, which last worked in 1940.

Cosmetic restoration for FR’s May 2013 Steam 150 celebrations was followed by confirmation it would

You’re reading a preview, subscribe to read more.

More from The Railway Magazine

The Railway Magazine3 min read
Partners ‘Proud’ Of Successful Nuclear Material Movements By Rail
NUCLEAR Transport Solutions (NTS), the parent company of Direct Rail Services, has announced that a project involving the movement of 1068 drums of low level radioactive waste from Winfrith in Dorset to Cumbria for final disposal, was concluded signi
The Railway Magazine12 min read
Yellow Submarines
IF you want to cross the Mersey from Birkenhead to Liverpool, you can catch one of the famous ferries or drive through the fume-filled road tunnel, but the Merseyrail electric trains will probably be the quickest. If the scenery does not match the ri
The Railway Magazine2 min read
Funding Confirmed To Build New Cross-border ‘Enterprise’ Fleet
PLANS to replace the cross-border‘Enterprise’fleet and deliver a sub two-hour journey between Dublin and Belfast have moved a step closer, with confirmation on April 9 of the €165 million funding. The‘Enterprise’programme has been funded as part of t

Related