Competition to design the National Railway Museum of the future begins
Sep 24, 2019
2 minutes
By Robin Jones
RAVAGE PRODUCTIONS, MALCOLM READING CONSULTANTS
ARCHITECTS are being invited to compete to produce the design for the new £16.5million Central Hall at the National Railway Museum (NRM) in York.
The scheme is part of the NRM’s £55m Vision 2025 masterplan and will link the two ‘halves’ of the museum, currently divided by Leeman
You’re reading a preview, subscribe to read more.
Start your free 30 days