The Railway Magazine

‘INN’ and OUT, UP and DOWN, ROUND and ROUND

The Siemens ‘Taurus’ Bo-Bo electric locomotive certainly looked sleek as it stood at the head of its ‘Railjet’ service at Innsbruck Hauptbahnhof, but I was not ready for its stage performance on departure for Bregenz via the Arlberg.

British railway enthusiasts are familiar with the tune hummed by Siemens EMUs on starting, but these Austrian Class 1116s clear their throat and then sing a perfect octave ‘Doh-Re-Me-Fah-So-Lah-Te-Doh’. I discount gossip that their 1976-built Class 1144 counterparts are to be retro-fitted with ‘Edelweiss’ but perhaps there is more credibility in the rumour that the Class 1116s dedicated to Alpine routes will be adapted to sing ‘Climb Ev’ry Mountain’.

Just why the Austrian Railways Östeirreiche Bundesbahn (OBB) should have decided to market their prime railway services ‘Railjet’ with connotations of heavily polluting aircraft, I am not sure, but it nevertheless seems to work. The most modern seven-car sets, with a ‘driver first’ at one end and a Class 1116 on the other, extend their airline pretensions by using ‘business’, ‘first’ and ‘economy’ branding, but economy is a good deal more comfortable than any airborne accommodation of the same name that I have used. Some services justify a double carriage often with a locomotive in the middle which ‘take off’ in an impressive style.

Tourist ‘honey-pots’

The main Innsbruck station is dominated by the intimidating Olympic ski-jump ramp, preparing arriving visitors for the Alpine slopes on their journey to such tourist honey-pots as fashionable Kitzbühel. Some of this is lost on the ‘Railjet’ passengers though because the new high-speed alignment to Jenbach, avoiding local passenger trains and intensive freight traffic along the Inn valley floor, involves a large proportion of tunnels. Leaving Innsbruck on the 08.40 Bregenz-Wien ‘Achensee’ express with a 4min deficit No. 1116-157’s driver was probably hoping for a tail wind. The 34km (21miles) to Jenbach were covered in 15min 30 sec at a startalthough I gather that 200kph (124mph) is the maximum permissible. We then ran the 24.9km (15.5miles) to Wörgl in 11min 20sec with a maximum speed a shade over 160kph (99mph).

You’re reading a preview, subscribe to read more.

More from The Railway Magazine

The Railway Magazine11 min read
Neville Hill 125 Years Old And Still Evolving
AS the 19th century drew to a close, the North Eastern Railway concluded that it needed another depot in Leeds to augment capacity. Accommodation at the former Leeds and Thirsk Railway’s Holbeck depot (about half-a-mile north of the ex-North Midland
The Railway Magazine1 min read
Heritage Line Landslip
THE Ecclesbourne Valley Railway has reached its £30,000 fundraising target to restore services to Duffield after a landslip. The target was reached with hundreds of donations from the public and one anonymous gift of £10,000. The railway has only bee
The Railway Magazine1 min read
Memorial Day Celebrates The Life Of RM Writer Peter Nicholson
WESTONZOYLAND Pumping Station Museum hosted a Memorial Day for the family and friends of the late Peter Nicholson on March 24. Peter, who made a significant contribution to railway preservation (standard and narrow gauge) as owner of a collection of

Related