The Railway Magazine

MOVING IN, MOVING ON, MOVING OUT

railmaguk1803_article_038_01_01

If you keep an eye on the railway press, the large number of orders for new trains in recent years won’t have escaped your attention. The launch of fleets such as Hitachi’s InterCity Express Trains (IETs) will no doubt have alerted you to the dawn of a new generation.

More and more passengers are using Britain’s railways, either to commute into our big cities or for leisure travel, and complaints about overcrowding and outdated trains have been on the rise. Couple that with a generation of ex-British Rail trains coming to the end of their working lives and the requirement for new and additional trains is clear.

By 2021, more than 7,000 new vehicles will have been added to the fleets of train operators across the country. Many will replace older trains such as the Class 142-144 ‘Pacers’ and iconic InterCity 125s, as well as a whole raft of ex-BR Electric Multiple Units (EMUs), while others will add much-needed extra capacity.

According to the Rail Delivery Group (RDG), the new vehicles “represent an investment of at least £13.8billion by the private sector in rail” and will enable “more than 6,400 extra services each week by 2021, benefiting all parts of the country”.

InterCity Express

The most high-profile, and largest, of the new train orders is the Government’s £5.7billion InterCity Express Programme (IEP). In summer 2012, the Department for Transport (DfT) agreed a deal with Hitachi Rail Europe for IC125 replacement trains, totalling 122 sets (866 vehicles), to replace current stock with Great Western Railway (57 sets) and Virgin Trains East Coast (65 sets).

The GWR fleet is being gradually filtered into passenger service after extensive type testing, and is a mix of Class 800 bi-mode five-car (36 sets) and 21 nine-car trains with 25kV AC overhead electric equipment and underfloor diesel engines.

Virgin Trains East Coast will have 10 five-car and 13 nine-car bi-modes plus 12 five-car and 30 nine-car 25kV AC Class 801 electric-only sets. They will be branded as ‘Azumas’ for East Coast Main Line services from King’s Cross to Yorkshire, the North East and Scotland. Even the ECML electric sets will feature a single diesel engine, allowing them to be shunted ‘off the wires’ or run at low speed to the nearest station if there’s a problem with the electric supply or route.

VTEC expects its first ‘Azumas’ to make their passenger debut in November.

On top of the IEP fleet, GWR has ordered a further 36 Class 802 bi-mode trains (22 five-car and 14 nine-car) with

You’re reading a preview, subscribe to read more.

More from The Railway Magazine

The Railway Magazine2 min read
Colne Valley Viaduct crosses the Grand Union Canal
DECK construction work for HS2’s 2.1-mile long Colne Valley Viaduct has just over half-a-mile to go after it reached the point where the structure crosses the Grand Union Canal at the end of March. By the time of it bridging the waterway near Denham
The Railway Magazine3 min read
Steam Loco Fleet Strengthened
THE Aln Valley Railway’s (AVR) steam locomotive fleet has been boosted by the news that the Northumberland line will be the new home for Hudswell Clark 0-6-0ST, Renishaw Ironworks No.6, works number 1366 built in 1919. The locomotive, along with fell
The Railway Magazine7 min read
Void Filled After Derailment
FOLLOWING the derailment of a Northern Rail Class 195 on March 22 near Grangeover-Sands, Network Rail has undertaken extensive repairs to the permanent way which took a month, the line reopening on April 22. Two Class 195s – Nos. 195104/133 – were wo

Related