The Railway Magazine

Multiple Aspects with Lord Berkeley

Is overbidding for the ECML franchise the whole story?

THE East Coast Main Line franchise debacle is depressingly familiar. Having had three failures in 10 years, it must be very unsettling for the staff who hear all the sales pitch from their new operators and end up working for a company that cannot carry on.

Ministers blame Virgin Trains East Coast (VTEC) for the current failure; clearly their bid was too high, but is that the whole story?

Network Rail was supposed to have delivered upgrades to improve speed, capacity and reliability, all listed in the franchise tender documents and, without these, VTEC clearly could

You’re reading a preview, subscribe to read more.

More from The Railway Magazine

The Railway Magazine1 min read
Sidelines
CLASS 18 No. 18006 was delivered to Freightliner at Crewe Basford Hall on April 9. It was dispatched from Wolverton by Beacon Rail, which owns all 15 members of the class of battery-diesel hybrid shunting locos, built for it by Clayton Equipment Ltd.
The Railway Magazine3 min read
End Of The Line
AFTER 98 years, peat haulage by rail came to an end on Bord na Móna (BnM) on March 29, when the last load of peat was hauled off the Bellair System near Ballycumber, Co. Offaly. Several locomotives had been transferred in by rail after being made red
The Railway Magazine3 min read
Steam Loco Fleet Strengthened
THE Aln Valley Railway’s (AVR) steam locomotive fleet has been boosted by the news that the Northumberland line will be the new home for Hudswell Clark 0-6-0ST, Renishaw Ironworks No.6, works number 1366 built in 1919. The locomotive, along with fell

Related